← FAQs

How long does a brand or product project take?

It depends on scope, but rough ranges: a focused brand identity system is typically 6–10 weeks. A full brand-plus-product engagement is 3–6 months. Larger system-level work or environmental design can extend further. I’ll give you a realistic timeline in the proposal — I’d rather quote longer and deliver well than rush and cut corners.

Have an idea or project?
Let's connect.

Have an idea
or project?
Let's connect.

Have and idea or project?
Let's connect.